14-1645 Bonhill Road, Mississauga, ON

Storefront Doors & Glass in Newmarket

Supply, installation and 24/7 emergency repair across Newmarket and the surrounding GTA — from our shop at 14-1645 Bonhill Road, Mississauga.

Call 800-522-6825Request a quote

Storefronts and glazed entrances we've installed and serviced in Newmarket — for Comark Holdings Inc, Commercial Building and Contracting Ltd, Roma Building Restoration Ltd, Yonge Investments Inc — among many more businesses here. Dependable people, quality products, since 1979.

Recent storefront projects near Newmarket

These jobs are in neighbouring cities — the same crew and the same trucks cover Newmarket.

  • Commercial Glass & Aluminum Doors installed by Canuck Door Systems for P.D.C Platinum Doors Canada Ltd in East Gwillimbury

    Storefront entrance doors

    P.D.C Platinum Doors Canada Ltd

    commercial client · East Gwillimbury · 2025

  • Commercial Glass & Aluminum Doors installed by Canuck Door Systems for Richmond Hill Golf Club in Richmond Hill

    Storefront entrance doors

    Richmond Hill Golf Club

    commercial client · Richmond Hill · 2025

  • Commercial Glass & Aluminum Doors installed by Canuck Door Systems for De Ponte Construction in Richmond Hill

    Storefront windows

    De Ponte Construction

    general contractor · Richmond Hill · 2025

Storefront Doors & Glass across Newmarket

We work throughout Newmarket — Newmarket Industrial Park, 404 Employment Area, Mulock Employment Area, Yonge Street Corridor and the blocks around them. The buildings here are mostly health sciences and healthcare, public sector administration and light manufacturing, and each puts different demands on a door: traffic volume, insurance and fire requirements, and how much downtime an opening can afford. Newmarket’s 87,942 residents keep those buildings busy.

We have completed 5 storefront jobs in Newmarket since 2022 — including work on Yonge Street.

Population
87,942
Main industries
health sciences and healthcare, public sector administration, light manufacturing and business and professional services
Building stock
warehouse and distribution facilities, light manufacturing plants, industrial flex units and regional shopping centres and retail plazas
Business parks
Newmarket Industrial Park, 404 Employment Area, Mulock Employment Area and Yonge Street Corridor
Serving since
1979
  • Newmarket Industrial Park
  • 404 Employment Area
  • Mulock Employment Area
  • Yonge Street Corridor
  • Davis Drive Corridor

Broken storefront glass or a jammed entrance in Newmarket: we dispatch 24/7.

Newmarket is roughly a 55-minute run from our Mississauga shop — less if a technician is already in the area — so a truck is usually on site the same day.

Emergency board-up, security and make-safe first — permanent repair scheduled after.

Call 800-522-6825

Aluminum storefront framing, and which series an opening in Newmarket takes

Framing is bought by series, and three things separate one from the next: how deep the frame is, where the glass sits in that depth, and how the corners go together. None of it shows from the pavement; all of it sets the price.

The full guide

The hardware in a storefront entrance, and what goes first

The glass and the framing almost never fail. What wears out on an entrance in Newmarket is the ironmongery holding the leaf up and pulling it shut, and that is what most storefront service calls turn out to be.

The full guide

Why a storefront leaks, and it is almost never the glass

Aluminum framing is a drained system, not a sealed one. Water gets past the outer face, runs down an internal gutter behind the glazing pocket and leaves through weeps at the sill. When it shows up inside, one of those three stages has been interrupted — and new glass fixes none of them.

The full guide

What a 25-year-old Newmarket storefront needs, and in what order

Most ground-floor elevations we are asked to price in Newmarket do not need replacing. The useful question at the survey is which three or four things are due now, and in what order.

The full guide

Supplying a storefront in Newmarket: the price and the date

We install what we supply and we supply on its own — contractors in Newmarket who hang their own buy the package cut and prepped to the schedule. Four things move the number more than size does.

The full guide

Related storefront work in Newmarket

Storefront glass repair & replacement

Aluminum storefront elevation installed by Canuck Door SystemsAluminum storefront entrance doors installed by Canuck Door Systems
Aluminum storefront elevation · Aluminum storefront entrance doors — storefront doors & glass by Canuck Door Systems

Storefronts for the work Newmarket buildings do

The sectors that dominate Newmarket — health sciences and healthcare, public sector administration, light manufacturing — each put a different kind of traffic through the front of the building.

Health sciences and healthcare

A clinic entrance is judged on whether a patient can get through it: clear width, opening force and a power operator, with the framing built to carry the operator header from the start. Adding one afterwards to framing that was never drawn for it is the expensive version of the same door.

Light manufacturing

A plant’s storefront is the front office bolted onto a steel building, and the two halves age differently. The framing is usually sound; what lets water in is the joint where aluminum meets precast. The elevation can be rebuilt without touching the production wall behind it.

Retail trade

This is the opening the system was drawn for: a narrow-stile leaf, the widest glass the opening allows, and a closer sized to the door traffic rather than to the frame. The work happens after close, bay by bay and hoarded overnight, so the store trades in the morning.

General contractors & new builds

Contractors price storefront off the glazing and door schedules, and three answers set the number: which series the elevation is drawn in, what the glass make-up is, and the date it lands on site. Supply-only is normal here — a crew that hangs its own doors buys the package prepped.

Logistics & warehousing

The elevation on a distribution building is the office end of it — a glazed entrance and a window band onto the visitor lot, everything behind it steel. It sees less traffic than a shop door and more abuse than anyone plans for, because it is also the door drivers come through with paperwork in both hands.

Food & pharma processing

Front-of-house glazing on a processing plant is a controlled entrance: an aluminum entry into a vestibule, sidelites either side, and hardware that latches every time because the room past it is pressure-controlled. Anodized rather than painted — the finish gets washed as often as the floor does.

Get a storefront quoted in Newmarket

Tell us the elevation — its rough width and height, whether the framing is staying, and what your trading hours are, because the sequence is most of the price. A photo from across the street is enough to start. Working from drawings? Send the glazing and door schedules and we quote to them.

Photos or shop drawings are enough to quote from, and most quotes go out within a day to a week. One-year warranty on products, three months on labour. BBB Rating A+.

Broken door right now? Call 800-522-6825 — we dispatch 24/7.

Common questions about storefront doors & glass

Is an aluminum storefront better than hollow metal?

They answer different questions. Aluminum carries large areas of glass on slim sightlines, never rusts, takes any anodized or powder-coat finish and is what a customer-facing entrance should be. Hollow metal is stronger, less expensive per opening and the only one of the two that can carry a fire label — which is why the front door is aluminum and the stairwell, the mechanical room and the back exit are steel. Most buildings we work on have both, and we supply both.

Can an aluminum storefront be fire-rated?

A standard aluminum storefront cannot carry a fire label. Aluminum softens well below the temperature a rated assembly has to survive, so where an opening needs a rating we put a labelled hollow-metal or rated wood assembly in it instead, with rated vision glazing if it still has to be seen through. Specialist steel-framed fire-rated glazing systems exist for glazed rated openings; they are a different product and a different price from ordinary storefront framing.

How long does a storefront take from order to installation?

Plan on 4–6 weeks to fabricate the framing and the glass once the measure and the shop drawings are approved, then 1–2 weeks to schedule the crew and install it — so roughly 5–8 weeks in total, depending on the size of the project. What usually sets the schedule is the glass rather than the aluminum: tempered and insulating units are made to size and cannot be recut. A broken opening does not wait for any of that — we board it up the same night and glaze when the unit lands. Installing a single entrance or a small storefront is usually a day on site; a large front or a new plaza for a general contractor runs over several weeks.

Request a quote

Tell us about the opening

Name, phone and email so we can reach you — tell us about the door and the quote comes back firmer and faster. We reply the same day.

Photos or shop drawings are enough to quote from, and most quotes go out within a day to a week. One-year warranty on products, three months on labour. BBB Rating A+.

Broken door right now? Call 800-522-6825 — we dispatch 24/7.