14-1645 Bonhill Road, Mississauga, ON

Storefront Doors & Glass in Ajax

Supply, installation and 24/7 emergency repair across Ajax and the surrounding GTA — from our shop at 14-1645 Bonhill Road, Mississauga.

Call 800-522-6825Request a quote

Storefronts and glazed entrances we've installed and serviced in Ajax — for Bulk Barn Food Ltd, Christian Faith Outreach Centre — among many more businesses here. Dependable people, quality products, since 1979.

Recent storefront projects in Ajax and surrounding areas

  • Commercial Glass & Aluminum Doors installed by Canuck Door Systems for Avi Construction Inc in Ajax

    Storefront entrance doors

    Avi Construction Inc

    general contractor · Ajax · 2025

  • Commercial Glass & Aluminum Doors installed by Canuck Door Systems in Scarborough

    Storefront windows

    Private client

    Scarborough · 2025

  • Commercial Glass & Aluminum Doors installed by Canuck Door Systems for Muddy York Electric in Scarborough

    Storefront elevation

    Muddy York Electric

    commercial client · Scarborough · 2026

Storefront Doors & Glass across Ajax

We work throughout Ajax — Central Employment Area, GTA East Industrial Park, Lakeridge Logistics Centre, Audley Road North Business Park and the blocks around them. The buildings here are mostly logistics, warehousing, and storage, advanced manufacturing and retail trade and commercial services, and each puts different demands on a door: traffic volume, insurance and fire requirements, and how much downtime an opening can afford. Ajax’s 126,666 residents keep those buildings busy.

Population
126,666
Main industries
logistics, warehousing, and storage, advanced manufacturing, retail trade and commercial services and healthcare and institutional
Building stock
mega-warehouses and distribution facilities, food processing and cold storage facilities, light industrial and flex-space units and big-box retail and power centres
Business parks
Central Employment Area, GTA East Industrial Park, Lakeridge Logistics Centre and Audley Road North Business Park
Serving since
1979
  • Central Employment Area
  • GTA East Industrial Park
  • Lakeridge Logistics Centre
  • Audley Road North Business Park
  • Kingston Road Corridor

Broken storefront glass or a jammed entrance in Ajax: we dispatch 24/7.

Ajax is roughly a 55-minute run from our Mississauga shop — less if a technician is already in the area — so a truck is usually on site the same day.

Emergency board-up, security and make-safe first — permanent repair scheduled after.

Call 800-522-6825

Aluminum storefront framing, and which series an opening in Ajax takes

Framing is bought by series, and three things separate one from the next: how deep the frame is, where the glass sits in that depth, and how the corners go together. None of it shows from the pavement; all of it sets the price.

The full guide

The hardware in a storefront entrance, and what goes first

The glass and the framing almost never fail. What wears out on an entrance in Ajax is the ironmongery holding the leaf up and pulling it shut, and that is what most storefront service calls turn out to be.

The full guide

Why a storefront leaks, and it is almost never the glass

Aluminum framing is a drained system, not a sealed one. Water gets past the outer face, runs down an internal gutter behind the glazing pocket and leaves through weeps at the sill. When it shows up inside, one of those three stages has been interrupted — and new glass fixes none of them.

The full guide

What a 25-year-old Ajax storefront needs, and in what order

Most ground-floor elevations we are asked to price in Ajax do not need replacing. The useful question at the survey is which three or four things are due now, and in what order.

The full guide

Supplying a storefront in Ajax: the price and the date

We install what we supply and we supply on its own — contractors in Ajax who hang their own buy the package cut and prepped to the schedule. Four things move the number more than size does.

The full guide

Related storefront work in Ajax

Storefront glass repair & replacement

Aluminum storefront elevation installed by Canuck Door SystemsAluminum storefront entrance doors installed by Canuck Door Systems
Aluminum storefront elevation · Aluminum storefront entrance doors — storefront doors & glass by Canuck Door Systems

Storefronts for the work Ajax buildings do

The sectors that dominate Ajax — logistics, warehousing, and storage, advanced manufacturing, retail trade and commercial services — each put a different kind of traffic through the front of the building.

Logistics, warehousing, and storage

The elevation on a distribution building is the office end of it — a glazed entrance and a window band onto the visitor lot, everything behind it steel. It sees less traffic than a shop door and more abuse than anyone plans for, because it is also the door drivers come through with paperwork in both hands.

Advanced manufacturing

A plant’s storefront is the front office bolted onto a steel building, and the two halves age differently. The framing is usually sound; what lets water in is the joint where aluminum meets precast. The elevation can be rebuilt without touching the production wall behind it.

Retail trade and commercial services

This is the opening the system was drawn for: a narrow-stile leaf, the widest glass the opening allows, and a closer sized to the door traffic rather than to the frame. The work happens after close, bay by bay and hoarded overnight, so the store trades in the morning.

Healthcare and institutional

A clinic entrance is judged on whether a patient can get through it: clear width, opening force and a power operator, with the framing built to carry the operator header from the start. Adding one afterwards to framing that was never drawn for it is the expensive version of the same door.

Food & pharma processing

Front-of-house glazing on a processing plant is a controlled entrance: an aluminum entry into a vestibule, sidelites either side, and hardware that latches every time because the room past it is pressure-controlled. Anodized rather than painted — the finish gets washed as often as the floor does.

Offices & business parks

A business-park elevation is the whole ground floor — entrance doors, a transom above and a window band running either side, thermally broken where the lobby is heated. Tenant turnover is what brings us back: a new sign, a new cylinder, and often a new entrance in an existing frame.

Get a storefront quoted in Ajax

Tell us the elevation — its rough width and height, whether the framing is staying, and what your trading hours are, because the sequence is most of the price. A photo from across the street is enough to start. Working from drawings? Send the glazing and door schedules and we quote to them.

Photos or shop drawings are enough to quote from, and most quotes go out within a day to a week. One-year warranty on products, three months on labour. BBB Rating A+.

Broken door right now? Call 800-522-6825 — we dispatch 24/7.

Common questions about storefront doors & glass

Can an aluminum storefront be fire-rated?

A standard aluminum storefront cannot carry a fire label. Aluminum softens well below the temperature a rated assembly has to survive, so where an opening needs a rating we put a labelled hollow-metal or rated wood assembly in it instead, with rated vision glazing if it still has to be seen through. Specialist steel-framed fire-rated glazing systems exist for glazed rated openings; they are a different product and a different price from ordinary storefront framing.

Can you replace a storefront without closing the store?

Yes, and for retail it is the normal way we do it. The elevation comes out and goes back in section by section, with temporary hoarding over anything left open, and the work is scheduled overnight or on your quietest day. Say at the quote stage what your trading hours are and the sequence gets built around them — retrofitting that constraint afterwards is what turns a four-night job into a two-week one.

How long does a storefront take from order to installation?

Plan on 4–6 weeks to fabricate the framing and the glass once the measure and the shop drawings are approved, then 1–2 weeks to schedule the crew and install it — so roughly 5–8 weeks in total, depending on the size of the project. What usually sets the schedule is the glass rather than the aluminum: tempered and insulating units are made to size and cannot be recut. A broken opening does not wait for any of that — we board it up the same night and glaze when the unit lands. Installing a single entrance or a small storefront is usually a day on site; a large front or a new plaza for a general contractor runs over several weeks.

Request a quote

Tell us about the opening

Name, phone and email so we can reach you — tell us about the door and the quote comes back firmer and faster. We reply the same day.

Photos or shop drawings are enough to quote from, and most quotes go out within a day to a week. One-year warranty on products, three months on labour. BBB Rating A+.

Broken door right now? Call 800-522-6825 — we dispatch 24/7.