Glass Aluminum Storefront in Toronto: A Yonge Street Front Replaced for Intercity Properties
The exterior glass and aluminum storefront at 3434 Yonge Street, Toronto, removed and replaced in Windspec 655 series framing for Intercity Properties Limited. Worked from a busy sidewalk, early in the day, and completed in February 2022 after a four-week COVID delay.

The job in numbers
| What was replaced | The exterior glass and aluminum storefront |
|---|---|
| System | Windspec 655 series storefront framing |
| Promised lead time | 6–8 weeks |
| Delay | 4 weeks, COVID-19 restrictions |
| Client | Intercity Properties Limited |
| Address | 3434 Yonge Street, Toronto, Ontario |
| Completed | February 2022 |
The exterior glass and aluminum storefront at 3434 Yonge Street in Toronto needed replacing, and Intercity Properties Limited was the client. The company came to Canuck directly, with no general contractor. We removed the old storefront and supplied and installed the new one, completing the job in February 2022.
A storefront replacement is not complicated work. Doing it on Yonge Street, from a busy sidewalk, is what took experience.
Four decades of doors for names Ontario knows — Canada’s Wonderland, Tim Hortons, Canadian Tire, the LCBO, Metrolinx, Marriott & Hilton hotels, the University of Toronto — plus thousands of businesses across the GTA. Dependable people, quality products, since 1979.
What went in
The new storefront is Windspec 655 series framing: full-height display glass along the front, and an entrance door in the same framing. The 655 carries both the fixed glass and the doors, so the whole front reads as one system.


Working on Yonge Street
The storefront sits right on a busy Yonge Street sidewalk. The crew came in early to get a parking spot close to the storefront and to beat the peak traffic.
A storefront on a main street has no yard, no loading area and no parking of its own. The glass and frames have to come off a truck and go straight into the opening, across a sidewalk that people are using. On this job the crew started early, to get a parking spot close to the storefront and to beat the peak traffic.
It took patience and experience to remove the old storefront and install the new one in a busy area, but it was done to the client's satisfaction.
A delay nobody could plan for
The client had been given a 6–8 week lead time. The job was delayed by four weeks because of COVID-19 restrictions.

Questions this job answers
Can a storefront be replaced on a busy street?
Yes. On this job the crew started early to get close parking and avoid peak traffic, and worked from the sidewalk in front of the store. It takes planning and patience.
How long does a storefront replacement take?
The lead time on this job was 6–8 weeks, covering drawings, production and installation. COVID-19 restrictions added four weeks in 2022.
What storefront system is used for a main-street front?
This job used Windspec 655 series framing, which carries both the display glass and the entrance doors in one system.
Where this sits
This was storefront replacement on Yonge Street in Toronto. For the same work on your building, start with the storefront doors in Toronto page.
Have an opening like this one?

A storefront on a busy street?
Send us photographs of the storefront and the street in front of it. We will tell you how the work can be done with the least disruption, and what it costs.